• Language
  • VEBKO

  • Introducing the Company and Products
    • Assembling Stages of AMT105 Tester
    • Disperesing Stages of AMT Tester
    • Introducing the Device and Equipment
    • Comparative Analysis of AMT105, AMT205, AMT103, and AMT203 Devices
    • AMPro Software Translation
  • Software Installation and Connection Setting
    • Software Installation
    • How to Connect to AMT
    • Simultaneous Connection of Several Testers
    • Resetting IP Address
    • Updating Firmware of Device Manually
  • Default Setting
    • General Setting of Rooms
    • General Setting of Rooms, Part2
    • Default Setting for “Report”
    • Preferences Page "Directory" & "Cash" Tab
    • "Connection & Firmware"Tab
    • Device Hardware Setting
    • Modifying and Improving the Translation of the Vebko Amirkabir Company Website
    • Power Control and Its Relation to Heat
    • Modifying and Improving AMPro Software Translation
  • Software Home Page
    • General Types of Rooms
    • Software Start Page
  • Modules Toolbar and Statusbar
    • Toolbar and Status Bar, Part 1
    • Toolbar and Status Bar, Part 2
    • “New Based on Custom Template” Option
    • Determining Decimal Numbers, Part 1
    • Determining Decimal Numbers Part 2
    • Analog Output Setting
    • Binary Input Setting, Part1
    • Binary Input Setting, Part2
    • Binary Output’S Setting
    • Extra Setting
    • Relay Specification in Test Object
    • Introducing the “RIO”
    • Introducing “XRIO”
    • XRIO Converter File
    • XRIO Converter, Part2
    • Complementary Explanation About “XRIO Converter”
    • XRIO and XRIO Converter
    • XRIO & Relay Setting in the Software
    • XRIO Converter Formula Writing
    • Writing “XRIO Converter” for an Overcurrent Relay
    • Writing Formula for the “XRIO Converter” 3
    • Writing Formula for “XRIO Converter”4
    • Writing Formula for “XRIO Converter”5
    • Complementary Explanations of “Device” Section
  • AMT Sequencer Module
    • An Introduction to the Sequencer Room
    • “Table View” Window
    • The Separate Toolbar of “Table View” Window
    • “Detail View” Tab
    • Analog Out Tab
    • Quick Type
    • Step Ramp Type
    • Continuous Ramp Type
    • Harmonic State
    • The “Transient” State Type:
    • The “Transient” State (Observing the Impedance Trajectory)
    • The "Transient" State (Observing the Differential Trajectory)
    • “Tracking” State
    • "Set Mode and Fault Type" : Part 1
    • "Set Mode and Fault Type" : Part 2
    • Additional Settings of “Detail View”
    • "Signal View" Window Part 1
    • “Signal View” Window, Part 2
    • “Signal View” Setting, Part 1
    • “Signal View” Setting, Part 2
    • ”Vector View” Window, Part 1
    • “Vector View” Window, Part 2
    • “Vector View” Window, Part 3
    • “Measurement View” Window, Part1
    • “Level Assessment” Tab
    • “Ramp Assessment” Tab
    • “Value Assessment” Tab
    • “Calculated Assessment” Tab
    • "Transient Assessment" Tab
    • Running the Test
    • Start-Condition-Repetition" Window
    • “Report Setting” Window
    • “Report View” Window
    • Advanced Settings of “Report” Part 1
    • Advanced Settings of “Report” Part 2
    • Abilty to Convert Output Binary Voltage to Current and Vice Versa
    • Sampled Value
  • AMT Overcurrent Module
    • Introducing Over Current Room
    • Relay Settings in the "Overcurrent" Room – Part 1
    • Relay Settings in the "Overcurrent" Room – Part 2
    • Relay Settings in “Overcurrent” Room, Part 3
    • Relay Settings in the "Overcurrent" Room – Part 4
    • Test View Window
    • “Pick Up-Drop Off” Window
    • “Overcurrent” Characteristic Curve
    • “Settings” Tab of “Overcurrent” Module, Part 1
    • “Settings” Tab of “Overcurrent” Module, Part 2
    • Directional Earth Fault
    • Complementary Explanation of “Overcurrent” Room
    • Directional Overcurrent
  • AMT VI STARTING Module
    • Introducing “VI Starting” Room
    • “Shot Test” Tab
    • “Check Test” Tab
    • "VI Starting" Room Setting
  • AMT Distance Module
    • Introducing “Distance” Room, Part 1
    • Introducing “Distance” Room, Part 2
    • Introducing “Distance” Room, Part 3
    • Introducing “Testview” Window in “Distance” Room, Part 1
    • “Check Test” Tab
    • “Search Test” Tab
    • “Distance” Room Settings, Part 1
    • “Distance” Room Settings, Part 2
    • Impedance View Window
    • “Zt Diagram” and “Medium Detail View” Windows
    • Grounding Factor in Distance
    • Distance Protection Voltage and Current Calculations in the Test Room
  • AMT Differential Module
    • Relay Settings in “Differential” Room, Part 1
    • Relay Settings in “Differential” Room, Part 2
    • Introducing “Test View” Window in “Differential” Room, Part 1
    • Introducing “Test View” Window in “Differential” Room, Part 2
    • “Differential” Room Settings
    • “Differential Characteristic” Window
    • No Combined Characteristic
    • Zero Sequence Elimination
    • Restricted Earth Fault
  • AMT Diff Harmonics Module
    • Introducing “AMT Diff. Harmonics” Room
    • “Test View” Window
    • “Setting” Tab
    • “Harmonic Restraint View” Window
  • AMT Transducer Module
    • “Offload” Test Part 1
    • “Offload” Test Part 2
    • “Onload” Test of the Meter
    • Transducer Test
    • How to Use the Optical Pulse Sensor in Meter Testing
  • AMT Synchronizer Module
    • An Introduction to AMT Synchronizer
    • Test View Window in Synchronizer Room
  • AMT VCC Room
    • AMT VCC Room
  • Current Transformer Module
    • Introducing “Current Transformer (CT)” Room
    • Secondary Burden Test
    • Winding Resistance Test
    • “Excitation Test” Tab, Part 1
    • “Excitation Test” Tab, Part 2
    • CT “Excitation Test”, Part 3
    • CT Excitation Test, Part 4
    • Other Tests Performable in “Excitation Test” Tab
    • CT Ratio and Polarity Test with Current Method
    • CT Ratio and Polarity Test (with Voltage)
    • CT Test Wiring Guide Using the Instrument Module
    • CT and PT Turns Ratio
    • Estimating FS and ALF for Various CTs
  • Circuit Breaker Module
    • Introducing “Circuit Breaker(CB)” Room
    • CB “Timing Test”
    • “Contact Resistance” Tab
    • Circuit Breaker Operation Minimum Voltage Test:
    • A Guide for Performing CB Test Connections Using the Instrument Module
  • capacitor voltage transformer
    • Capacitive Voltage Transformers
    • Secondary Burden Test
    • Short-Circuit Impedance Tab
    • Winding Resistance Test
    • Excitation Tab
    • CVT Ratio2
    • Ratio Tab
    • A Guide for Cvt Test Wiring Using the Instrument Module
  • Transformer Module
    • Introducing “Transformer” Room
    • “Vector Group, Turns Ratio and No Load” Tab
    • “Magnetic Balance” Tab
    • “Winding Resistance” Tab
    • “Leakage Reactance“ Tab
    • “Demagnitize” Tab
    • Guide to Performing Transformer Test Using Instrument Module
    • Zero Sequence Elimination
    • How to Use Clamps in Transformer Testing
  • OverCurrent Quick Test Room
    • Overcurrent Quick Test Room
  • Under OverVoltage Test Room
    • Under Over Voltage Test Room
  • AMT AR Room
    • AMT Ar Room
  • Resistance Test
    • Resistance Test
  • Troubleshooting
    • The Complete Main Switching
    • Main Switching Error Overcurrent Board
    • Overcurrent Error of Board 2 Part 1
    • Overcurrent Error Board 2 Part2
    • Switching Troubleshooting
    • OC Board IGBT Test
    • Introducing the Internal Modules Part1
    • Introduceing Internal Modules Part2
    • Introducing Internal Modules Part3
    • Switching Module
    • Possible Errors in the Switching Module
    • Checking the Parts,in Switching Module Errors Part1
    • Checking the Parts,in Switching Module Errors Part2
    • Checking the Parts,in Switching Module Errors Part3
    • The Connections Between the Switching Module and the Amplifier
  • Testing of relays protection functions
    • End-to-End Test
    • Overvoltage Protection Function Test in MICOM P141 Relay
    • Undervoltage Protection Function Test in MICOM P141 Relay
    • Directional Overcurrent Protection Function Test in MICOM P141 Relay
    • Directional Earth Fault (DEF) Protection Function Test in MICOM P141 Relay
    • New End-to-End Test
    • Drawing the Distance Characteristics and Practical Example of Drawing the Quad Characteristic in Siemens 7SA522 Relay
    • Drawing the Load Encroachment Characteristic
    • Drawing the Mho Characteristic in GEC PYTC Relay
    • Synchronizer Function Test in SIPROTEC Siemens 7SD82 Relay
    • 51V Function Test in Siemens 7SD82 Relay
    • Non-Directional Overcurrent Protection Test in AMR Relay (Simple Test Using Templates)
    • Under Voltage Protection Test in AMR Relay (Simple Test Using Templates)
    • Overvoltage Protection Test in AMR Relay (Simple Test Using Templates)
    • Negative Sequence Overcurrent Protection Test in AMR Relay (Simple Test Using Templates)
    • Directional Overcurrent Protection Test in AMR Relay (Simple Test Using Templates)
    • Non-Directional Overcurrent Protection Test in AMR Relay (Simple Test Using Templates)
    • Distance Protection Test in AMR Relay (Simple Test Using Templates)
    • Differential Protection Test in AMR Relay (Simple Test Using Templates)
    • Rogowski Coil Test
  • ZA
  • Goose Messaging Testing
    • GOOSE Messaging Testing
  • Trust the Software
    • Guide to Trusting Vebko(Stable-Test) Software in Bitdefender Antivirus
    • Guide to Trusting Vebko(Stable-Test) Software in Kaspersky Antivirus
    • Guide to Trusting Vebko(Stable-Test) Software in NOD32 Antivirus
  • PMU Test
    • PMU Test
  • ZE
  • Introdusing Company and Produces
    • Assembly Stages of AMR Relay
  • Software Download and Installation
    • Software Installation
  • Software Homepage and Create Project
    • Login to the Main Environment of the Software
  • Connection and Update Firmware
    • Connect with Relay
    • Firmware Relay Update
  • Relay Hardware
    • Relay Hardware Module
    • Voltage and Current Transformers Data
  • AMR Relay Test
    • Differential Protection Test in AMR Relay (Simple Test Using Templates)
    • Directional Overcurrent Protection Test in AMR Relay (Simple Test Using Templates)
    • Negative Sequence Overcurrent Protection Test in AMR Relay (Simple Test Using Templates)
    • Distance Protection Test in AMR Relay (Simple Test Using Templates)
    • Non-Directional Overcurrent Protection Test in AMR Relay (Simple Test Using Templates)
    • Overvoltage Protection Test in AMR Relay (Simple Test Using Templates)
    • Under Voltage Protection Test in AMR Relay (Simple Test Using Templates)
  • Real Testing Requires Realistic Signals
  • AMPro Protocol Sniffer
  • Meet SV100+
  • IEC 61850 Sampled Values Testing
  • Digital substations run at the speed of light
  • Don’t Just Test Your Relays. Simulate the Grid
  • Smart Configuration Inheritance in VCC — With Full Control
  • Control What Appears in Your Test Report
  • From Comtrade to Inject
  • Design and Navigate Complex Test Procedures with the AMPRO Sequencer
  • One State. Four Transitions. Total Control
  • Stop waiting for the test to finish
  • Balanced System, Zero Trip, Infinite Confidence
  • Defining Complex Logic For Assessments
  • Advanced Assessments
  • Vebko Around The World
  • Noise Suppression in Transformer Turns Ratio
  • Relay Data in Quick Access
  • Wiring Clarity - Without Leaving Your Workspace
  • Design and Navigate Complex Test Procedures with the AMPRO Sequencer
  • Flexible Connectivity with AMT205 in AMPRO
  • Simultaneous Ramp on All Outputs [AMT205]
  • Continuous Ramp Capability [AMT205]
  • Distance Search Testing
  • Comprehensive Circuit Breaker Testing [AMT205]
  • Smarter Configuration In VCC File
  • New Feature In Vebko AMPro
  • Vebko Educational Videos
  • Contact Resistance Measurement
  • Test With Confidence
  • Control Your Report
  • One Device, Any Relay
  • DC Resistance Measurement
  • History of Amt105 GPS
  • History of Amt105 Wifi
  • AMT 105 Features
  • Catalog
    • Catalog All
    • Accessories
    • Agencies
    • Catalog
    • Hardware
  • PDF Download PDF
    0 / 0

    Under Over Voltage Test Room

    Imported Content

    On the start page of the software, by clicking on "Under Over Voltage Test“ from „Special Test“ subcategory, enter the environment related to testing numbers 27 and 59 voltage functions. This room is designed to simplify testing the mentioned functions and create various states automatically.

    „Under Over Voltage Test“ room is composed of six main windows of „Instrument Test“, „Detail View“, „Signal View“, „Table View“, Report“ and „Measurement View“ and for a better analysis and examination, it is possible to add other windows such as „Vector View“ from the menu at the top.

    To begin, different information such as relay type, serial number, station name, feeder/be number and the name of the device manufacturer must be entered in „Test Object“ section. The date of performing the test in AD,

    the information of the performer of the test and the information of the supervisor of the test are entered in „Date“, „Tested by“ and „Approved by“ fields, respectively. This information will be used in the final report.

    In ‚Test Settings“ section, the intended function is selected from among „OV“ and „UV“ in „Function Type“ field. Also, the secondary nominal voltage and the operation mode are selected from among OR and AND in „Vnom sec“ and „Operation mode“ fields, respectively.  

    If the mentioned functions need a current value to operate, such as „Minimum Current“ element, it is possible to check „Enable Current“ option and select the necessary current value.  

    If the intended connection of the user is open delta connection, they can check “Open Delta” option.  

    Every time „Insert Row“ is pressed a row in „Data Table“ is created in accordance with the number of voltage stages entered in the relay to enter the information of every Stage.

    In the created row, the stage number is entered in „Stage No“ and in „V setting“ section, the amount of the voltage setting for the mentioned functions is entered.

    In „Voltage Type“ section, the voltage calculation algorithm is specified which can be in form of phase to earth or phase to phase.

    Also, the time settings are entered in „Time Setting“ section.

    „Reset Ratio“ is the reference considered for measuring the amount of reset voltage,

    „Tol.Time“ is the amount of the accepted time error in form of percentage

    and „Tol.Voltage“ determines the amount of the accepted voltage error in the result of the test.

    The settings related to „States“, „Binaries“, Pickup“ and „Dropoff“ are entered in „Testing“ tab.

    Also, it is possible to specify the voltage change condition from among „Continuous Ramp“ and „Step Ramp“ in „State Type“ section.

    In „State Pickup/Drop Out Termination“ section, the condition for ending the pickup and dropoff is selected in form of a separate contact such as C2 or pressing Space key at the same time as the LED turns on or the Trip contact.

    The conditions for recording the Trip is specified in „State Trip Termination“ section.

    Also, it is possible to consider a different binary input for recording pickup-dropoff or trip in „Hardware Configuration“ section.

    By pressing „Add Row“ key in „Test Plan“ section, new rows are added for the test in accordance with the stages created in „Test Object“. If „Continous Ramp“ option is checked in „State Type“ section, the settings are as follows:

    In „Stage No“ section, it is possible to specify the stage number of the function operation. In „Fault Type“ section,

    the fault type for every phase or a combination of phases is selected.

    In „Time Test“ section, it is specified that whether the user wishes the voltage function operation time to be estimated or not.

    In „Vtest“ section, the voltage in which the relay operation time is going to be examined is entered.

    In „PU Test“ and „ DOU Test“ sections it is specified that whether the user wishes to perform these two tests or not.

    In „PU Val. Assess“ section, the evaluated value from the pickup voltage is entered

    and in „PU Start“ section, the start point of the voltage test is specified.

    „PU End“ and „DOU End“ stand for the final voltage value in the pickup and dropoff, respectively.

    In „Total“ section, the time duration considered for every pickup or out dropoff state is entered. The longer this time, the more continuos paces.

    If „Step Ramp“ option is selected in „State Type“ section, instead of „Total“ column, „dt (PU)“ which is the time duration considered for every voltage change pace in pickup states, „du(DOU)“ which is the time duration considered for every voltage change pace in dropoff states and „dv“ which is the amount of the voltage change paces are specified.

    After entering the mentioned values, by clicking on „Init Test“, the user can view the states that are created in „Table View“, and in „Measurement View“, in „Time Assessmet“ and „Ramp Assessment“ windows, see that the values are entered as the test result evaluation. It should be noted that by selecting any State and pressing the middle button of the mouse, the user can view the details related to that state.

    As an example, here an overvoltage function with 76 volts as the setting, and 4 seconds as the time setting in Micom P141 relay is tested.

    After applying the necessary settings in the relay, the configuration is specified as it can be seen.

    For this purpose, LEDs 1 and 4 of the relay are configured to show the pickup and the trip of this function, respectively.

    In the output contacts section, R4 is specified as the contact for recording the pickup. Moreover, R6 output contact in the relay is configured as a trip contact.

    To run the test, by opening a new window in „Over/Unver Voltage“ room and after entering the primary information such as the relay type, serial number, station name, feeder/be name and the manufacturer company, as an example, function OV is selected and the secondary voltage is set at 110 volts and OR is selected as the operation mode so that the results are recorded with pickup or trip of any of the phases. Since here there is no need for current injection, Enable Current option is not enabled. Also, since here open delta connection is not the case, Open Delta option is not selected either.

    In Data Table, stage 1 is selected and the voltage setting is set at 76 volts (the value specified in the relay) and LN is selected in Voltage Type section. The time setting of the relay is 4 seconds which is entered in Time Setting section.

    Now by going to the State Setting in Testing section, Continuous Ramp option is selected. Here binary C2 and C1 are selected to record the pickup and drop and record the trip, respectively.

    Since the purpose of the overvoltage element test is to test all three phases, Fault Type option is set at L1E L2E L3E. 80 volts is entered In Vtest section which is bigger than the voltage specified in the relay settings and the relay must give a trip in this voltage. Also, by selecting Yes in “PU Test” and “DOU Test” section, pickup test and drop out will be done. In PU Val.Assess section, the approximate estimation of the value expected for the pickup which is 75.5 is entered. The test voltage start value and the final voltage value for the pickup test are specified in PU Start and PU End sections, respectively. DOU End is the final voltage value for ending the dropout test. The total time is entered in Total section.

    Now Init test button is pressed so that the states are created in „Table View“ in accordance with the entered information. After running the test, the results of the evaluation can be viewed in „Measurement View“ window, „Time Assessment“ and „Ramp Assessment“ tabs.

    In the end, after runing the test it is necesary to add the results to the report which is done by pressing „Add to Report“. Also, if you wish to add specific parts of the test to the report or delete or edit the report, you need to use “Add to Report” cog. By clicking on this cog, the items that can be added to the “Report” are displayed as checked checkboxes and if you wish any of them not to be added to the report, uncheck the intended checkbox. It should be noted that after doing the tests, the results are not automatically added to the report and after doing every test, it is necessary to manually add the results of the performed test to the output report by pressing “Add to Report” before Clearing the test.

     [jg1]Under_Over_Voltage_test_room

    Related topics

    • “Pick Up-Drop Off” Window AMT Overcurrent Module
    • “Settings” Tab of “Overcurrent” Module, Part 2 AMT Overcurrent Module
    • Overvoltage Protection Test in AMR Relay (Simple Test Using Templates) AMR Relay Test
    • Overvoltage Protection Test in AMR Relay (Simple Test Using Templates) Testing of relays protection functions
    • Under Voltage Protection Test in AMR Relay (Simple Test Using Templates) AMR Relay Test
    • Under Voltage Protection Test in AMR Relay (Simple Test Using Templates) Testing of relays protection functions
    • Relay Settings in the "Overcurrent" Room – Part 1 AMT Overcurrent Module
    • Overvoltage Protection Function Test in MICOM P141 Relay Testing of relays protection functions
    Sharing Window
    Telegram Telegram WhatsApp WhatsApp Eitaa Eitaa FaceBook FaceBook Linkedin Linkedin X X
    Under Over Voltage Test Room
    Tap play once on mobile if autoplay is blocked.
    En Fa De Tr Mu
    MP4
    MP3
    SRT
    DOC