• Language
  • VEBKO

  • Introducing the Company and Products
    • Assembling Stages of AMT105 Tester
    • Disperesing Stages of AMT Tester
    • Introducing the Device and Equipment
    • Comparative Analysis of AMT105, AMT205, AMT103, and AMT203 Devices
    • AMPro Software Translation
  • Software Installation and Connection Setting
    • Software Installation
    • How to Connect to AMT
    • Simultaneous Connection of Several Testers
    • Resetting IP Address
    • Updating Firmware of Device Manually
  • Default Setting
    • General Setting of Rooms
    • General Setting of Rooms, Part2
    • Default Setting for “Report”
    • Preferences Page "Directory" & "Cash" Tab
    • "Connection & Firmware"Tab
    • Device Hardware Setting
    • Modifying and Improving the Translation of the Vebko Amirkabir Company Website
    • Power Control and Its Relation to Heat
    • Modifying and Improving AMPro Software Translation
  • Software Home Page
    • General Types of Rooms
    • Software Start Page
  • Modules Toolbar and Statusbar
    • Toolbar and Status Bar, Part 1
    • Toolbar and Status Bar, Part 2
    • “New Based on Custom Template” Option
    • Determining Decimal Numbers, Part 1
    • Determining Decimal Numbers Part 2
    • Analog Output Setting
    • Binary Input Setting, Part1
    • Binary Input Setting, Part2
    • Binary Output’S Setting
    • Extra Setting
    • Relay Specification in Test Object
    • Introducing the “RIO”
    • Introducing “XRIO”
    • XRIO Converter File
    • XRIO Converter, Part2
    • Complementary Explanation About “XRIO Converter”
    • XRIO and XRIO Converter
    • XRIO & Relay Setting in the Software
    • XRIO Converter Formula Writing
    • Writing “XRIO Converter” for an Overcurrent Relay
    • Writing Formula for the “XRIO Converter” 3
    • Writing Formula for “XRIO Converter”4
    • Writing Formula for “XRIO Converter”5
    • Complementary Explanations of “Device” Section
  • AMT Sequencer Module
    • An Introduction to the Sequencer Room
    • “Table View” Window
    • The Separate Toolbar of “Table View” Window
    • “Detail View” Tab
    • Analog Out Tab
    • Quick Type
    • Step Ramp Type
    • Continuous Ramp Type
    • Harmonic State
    • The “Transient” State Type:
    • The “Transient” State (Observing the Impedance Trajectory)
    • The "Transient" State (Observing the Differential Trajectory)
    • “Tracking” State
    • "Set Mode and Fault Type" : Part 1
    • "Set Mode and Fault Type" : Part 2
    • Additional Settings of “Detail View”
    • "Signal View" Window Part 1
    • “Signal View” Window, Part 2
    • “Signal View” Setting, Part 1
    • “Signal View” Setting, Part 2
    • ”Vector View” Window, Part 1
    • “Vector View” Window, Part 2
    • “Vector View” Window, Part 3
    • “Measurement View” Window, Part1
    • “Level Assessment” Tab
    • “Ramp Assessment” Tab
    • “Value Assessment” Tab
    • “Calculated Assessment” Tab
    • "Transient Assessment" Tab
    • Running the Test
    • Start-Condition-Repetition" Window
    • “Report Setting” Window
    • “Report View” Window
    • Advanced Settings of “Report” Part 1
    • Advanced Settings of “Report” Part 2
    • Abilty to Convert Output Binary Voltage to Current and Vice Versa
    • Sampled Value
  • AMT Overcurrent Module
    • Introducing Over Current Room
    • Relay Settings in the "Overcurrent" Room – Part 1
    • Relay Settings in the "Overcurrent" Room – Part 2
    • Relay Settings in “Overcurrent” Room, Part 3
    • Relay Settings in the "Overcurrent" Room – Part 4
    • Test View Window
    • “Pick Up-Drop Off” Window
    • “Overcurrent” Characteristic Curve
    • “Settings” Tab of “Overcurrent” Module, Part 1
    • “Settings” Tab of “Overcurrent” Module, Part 2
    • Directional Earth Fault
    • Complementary Explanation of “Overcurrent” Room
    • Directional Overcurrent
  • AMT VI STARTING Module
    • Introducing “VI Starting” Room
    • “Shot Test” Tab
    • “Check Test” Tab
    • "VI Starting" Room Setting
  • AMT Distance Module
    • Introducing “Distance” Room, Part 1
    • Introducing “Distance” Room, Part 2
    • Introducing “Distance” Room, Part 3
    • Introducing “Testview” Window in “Distance” Room, Part 1
    • “Check Test” Tab
    • “Search Test” Tab
    • “Distance” Room Settings, Part 1
    • “Distance” Room Settings, Part 2
    • Impedance View Window
    • “Zt Diagram” and “Medium Detail View” Windows
    • Grounding Factor in Distance
    • Distance Protection Voltage and Current Calculations in the Test Room
  • AMT Differential Module
    • Relay Settings in “Differential” Room, Part 1
    • Relay Settings in “Differential” Room, Part 2
    • Introducing “Test View” Window in “Differential” Room, Part 1
    • Introducing “Test View” Window in “Differential” Room, Part 2
    • “Differential” Room Settings
    • “Differential Characteristic” Window
    • No Combined Characteristic
    • Zero Sequence Elimination
    • Restricted Earth Fault
  • AMT Diff Harmonics Module
    • Introducing “AMT Diff. Harmonics” Room
    • “Test View” Window
    • “Setting” Tab
    • “Harmonic Restraint View” Window
  • AMT Transducer Module
    • “Offload” Test Part 1
    • “Offload” Test Part 2
    • “Onload” Test of the Meter
    • Transducer Test
    • How to Use the Optical Pulse Sensor in Meter Testing
  • AMT Synchronizer Module
    • An Introduction to AMT Synchronizer
    • Test View Window in Synchronizer Room
  • AMT VCC Room
    • AMT VCC Room
  • Current Transformer Module
    • Introducing “Current Transformer (CT)” Room
    • Secondary Burden Test
    • Winding Resistance Test
    • “Excitation Test” Tab, Part 1
    • “Excitation Test” Tab, Part 2
    • CT “Excitation Test”, Part 3
    • CT Excitation Test, Part 4
    • Other Tests Performable in “Excitation Test” Tab
    • CT Ratio and Polarity Test with Current Method
    • CT Ratio and Polarity Test (with Voltage)
    • CT Test Wiring Guide Using the Instrument Module
    • CT and PT Turns Ratio
    • Estimating FS and ALF for Various CTs
  • Circuit Breaker Module
    • Introducing “Circuit Breaker(CB)” Room
    • CB “Timing Test”
    • “Contact Resistance” Tab
    • Circuit Breaker Operation Minimum Voltage Test:
    • A Guide for Performing CB Test Connections Using the Instrument Module
  • capacitor voltage transformer
    • Capacitive Voltage Transformers
    • Secondary Burden Test
    • Short-Circuit Impedance Tab
    • Winding Resistance Test
    • Excitation Tab
    • CVT Ratio2
    • Ratio Tab
    • A Guide for Cvt Test Wiring Using the Instrument Module
  • Transformer Module
    • Introducing “Transformer” Room
    • “Vector Group, Turns Ratio and No Load” Tab
    • “Magnetic Balance” Tab
    • “Winding Resistance” Tab
    • “Leakage Reactance“ Tab
    • “Demagnitize” Tab
    • Guide to Performing Transformer Test Using Instrument Module
    • Zero Sequence Elimination
    • How to Use Clamps in Transformer Testing
  • OverCurrent Quick Test Room
    • Overcurrent Quick Test Room
  • Under OverVoltage Test Room
    • Under Over Voltage Test Room
  • AMT AR Room
    • AMT Ar Room
  • Resistance Test
    • Resistance Test
  • Troubleshooting
    • The Complete Main Switching
    • Main Switching Error Overcurrent Board
    • Overcurrent Error of Board 2 Part 1
    • Overcurrent Error Board 2 Part2
    • Switching Troubleshooting
    • OC Board IGBT Test
    • Introducing the Internal Modules Part1
    • Introduceing Internal Modules Part2
    • Introducing Internal Modules Part3
    • Switching Module
    • Possible Errors in the Switching Module
    • Checking the Parts,in Switching Module Errors Part1
    • Checking the Parts,in Switching Module Errors Part2
    • Checking the Parts,in Switching Module Errors Part3
    • The Connections Between the Switching Module and the Amplifier
  • Testing of relays protection functions
    • End-to-End Test
    • Overvoltage Protection Function Test in MICOM P141 Relay
    • Undervoltage Protection Function Test in MICOM P141 Relay
    • Directional Overcurrent Protection Function Test in MICOM P141 Relay
    • Directional Earth Fault (DEF) Protection Function Test in MICOM P141 Relay
    • New End-to-End Test
    • Drawing the Distance Characteristics and Practical Example of Drawing the Quad Characteristic in Siemens 7SA522 Relay
    • Drawing the Load Encroachment Characteristic
    • Drawing the Mho Characteristic in GEC PYTC Relay
    • Synchronizer Function Test in SIPROTEC Siemens 7SD82 Relay
    • 51V Function Test in Siemens 7SD82 Relay
    • Non-Directional Overcurrent Protection Test in AMR Relay (Simple Test Using Templates)
    • Under Voltage Protection Test in AMR Relay (Simple Test Using Templates)
    • Overvoltage Protection Test in AMR Relay (Simple Test Using Templates)
    • Negative Sequence Overcurrent Protection Test in AMR Relay (Simple Test Using Templates)
    • Directional Overcurrent Protection Test in AMR Relay (Simple Test Using Templates)
    • Non-Directional Overcurrent Protection Test in AMR Relay (Simple Test Using Templates)
    • Distance Protection Test in AMR Relay (Simple Test Using Templates)
    • Differential Protection Test in AMR Relay (Simple Test Using Templates)
    • Rogowski Coil Test
  • ZA
  • Goose Messaging Testing
    • GOOSE Messaging Testing
  • Trust the Software
    • Guide to Trusting Vebko(Stable-Test) Software in Bitdefender Antivirus
    • Guide to Trusting Vebko(Stable-Test) Software in Kaspersky Antivirus
    • Guide to Trusting Vebko(Stable-Test) Software in NOD32 Antivirus
  • PMU Test
    • PMU Test
  • ZE
  • Introdusing Company and Produces
    • Assembly Stages of AMR Relay
  • Software Download and Installation
    • Software Installation
  • Software Homepage and Create Project
    • Login to the Main Environment of the Software
  • Connection and Update Firmware
    • Connect with Relay
    • Firmware Relay Update
  • Relay Hardware
    • Relay Hardware Module
    • Voltage and Current Transformers Data
  • AMR Relay Test
    • Differential Protection Test in AMR Relay (Simple Test Using Templates)
    • Directional Overcurrent Protection Test in AMR Relay (Simple Test Using Templates)
    • Negative Sequence Overcurrent Protection Test in AMR Relay (Simple Test Using Templates)
    • Distance Protection Test in AMR Relay (Simple Test Using Templates)
    • Non-Directional Overcurrent Protection Test in AMR Relay (Simple Test Using Templates)
    • Overvoltage Protection Test in AMR Relay (Simple Test Using Templates)
    • Under Voltage Protection Test in AMR Relay (Simple Test Using Templates)
  • Real Testing Requires Realistic Signals
  • AMPro Protocol Sniffer
  • Meet SV100+
  • IEC 61850 Sampled Values Testing
  • Digital substations run at the speed of light
  • Don’t Just Test Your Relays. Simulate the Grid
  • Smart Configuration Inheritance in VCC — With Full Control
  • Control What Appears in Your Test Report
  • From Comtrade to Inject
  • Design and Navigate Complex Test Procedures with the AMPRO Sequencer
  • One State. Four Transitions. Total Control
  • Stop waiting for the test to finish
  • Balanced System, Zero Trip, Infinite Confidence
  • Defining Complex Logic For Assessments
  • Advanced Assessments
  • Vebko Around The World
  • Noise Suppression in Transformer Turns Ratio
  • Relay Data in Quick Access
  • Wiring Clarity - Without Leaving Your Workspace
  • Design and Navigate Complex Test Procedures with the AMPRO Sequencer
  • Flexible Connectivity with AMT205 in AMPRO
  • Simultaneous Ramp on All Outputs [AMT205]
  • Continuous Ramp Capability [AMT205]
  • Distance Search Testing
  • Comprehensive Circuit Breaker Testing [AMT205]
  • Smarter Configuration In VCC File
  • New Feature In Vebko AMPro
  • Vebko Educational Videos
  • Contact Resistance Measurement
  • Test With Confidence
  • Control Your Report
  • One Device, Any Relay
  • DC Resistance Measurement
  • History of Amt105 GPS
  • History of Amt105 Wifi
  • AMT 105 Features
  • Catalog
    • Catalog All
    • Accessories
    • Agencies
    • Catalog
    • Hardware
  • PDF Download PDF
    0 / 0

    Secondary Burden Test

    In this test, the “Burden” connected to the “CVT” secondary is measured. In this test, by injecting “AC” current and measuring the “AC” voltage by “Binary/Analog Input” and dividing voltage by current, “Z” and its angle and consequently “R” and “X” values are obtained. To do this test, after going to “State Setting” section, the current and time of the test must be entered in “I test” and “State Time” fields, respectively. The current limitation specified for this field is “32” amperes. After entering the “State Setting” information, the wiring must be done in accordance with the instructions picture. It should be noted that by double-clicking on the picture, it is possible to magnify it. To perform this test, in the first step, the “CVT” must be separated from all elements that are used for transferring voltage to measurement devices. In this wiring “Jumper” “la1” and “lb1” current outputs and connect “la2” and “lb2” to the “CVT” voltage transmission path.

    Also, to measure the “AC” voltage, “Binary/Analog Input1” must be connected to the test path a little further from the current injection connectors. This should be noted that before performing the test, it is necessary to press “Init Test” so that the device is automatically “Configured”. By selecting this option, the settings including current and test time as well as hardware settings related to “Hardware Configuration” including the outputs of the device and “Binary/Analog Inputs” are adjusted by the device automatically. In “Analog Output” tab in “Hardware Configuration” section, we can see that the wiring of the device is set at “32A” with the maximum “Burden” of 400 Volts ampere and the “Binary/Analog Input1” is activated for voltage measurement. To better analyze the test, “Table View”, ”Detail View” and “Signal View” windows can be used. After opening “Table View” window, you can see that a “State” with the “50Hz” frequency and in accordance with the entered information in “State Setting” section is created. If you wish to view the information more thoroughly, use “Detail View” window instead.

    Performing the test and analyzing the results

    After adjusting the wiring, here, 5 amps and 5 seconds are entered as test current and test time, respectively, and after pressing “Init Test”, the test starts. In “Signal View” it is possible to view the waveform of “Actual” and the voltage measured by “Binary/Analog Input”. Also, in “Signal View” by using the waveforms of “Actual” and the voltages recorded in “Signal View” it is possible to examine the connection of the connectors. In “Result” section, the user can view the results after the test is finished. The results include “linj”, the amount of injected current, “Vmeas”, the measured voltage, impedance, “impedance Angle” and finally the values of “R” and “X” are displayed using the “Z Cos(phi)” and “Z Sin(phi)” relations, respectively. In “Actual Burden” field, the amount of burden that the “CT” secondary can supply in the nominal current is calculated and the result is entered in this field by the software. In the end, after the test is finished, it is necessary to add the test results to the report which, in equipment test, is done by pressing “Add to Report”.

    Also, if you wish to add certain parts of the evaluation to the report or to edit the report, use “Add to Report” cog. By clicking on this cog, the elements that can be added to the “Report” are displayed by checked checkboxes and you can uncheck any undesired elements. Note that after any test, the results are not automatically added to the report and it is necessary to add the results of the performed test to the output report by pressing “Add To Report” before “Clearing the test”. It should also be noted that if the “Burden” of the path is low and the user wishes to have a more accurate measurement or “Binary/Analog Input1” is damaged, it is necessary to change the specified “Binary Input”. To do this, after pressing “Init Test” and checking “Don’t Change Hardware Setting” option, the user must enter “Hardware Configuration” window and specify a new input in “Binary/Analog Input” tab. Here, as an example, “Input10” is selected and after adjusting the necessary settings, the test is performed and the results are viewed. If you wish to select a binary between binaries “1” to “8”, you have to enter the “Binary Input Target” in accordance with the default binary number. For example, to use “Input7”, “Bin1” must be selected as the “Binary Input Target”.  For this, it is suggested to right-click on “Input1” row and “Cut” the information and “Paste” it in the intended row. To change the current wiring, it should be noted that the “Output Target” of the selected wiring must be “lL1”.

    Two more notable points in performing the test are that first, “Error Other” in a test indicates that there is a problem in the connection of wirings of the current path or resistance is too high that the device is unable to provide the “Burden” needed for current injection. Therefore, in cases of facing this error, you can go to “Signal View” and examine the “Actual” value of the current. If the current is injected by the device (“Actual Current”) but its difference with the specified current is high, this means that the path resistance is high and if the “Actual Current” is zero, it means that the current injection path is open. Where the path resistance is high, the test current must be decreased and in cases of a zero “Actual Current”, the connection of connectors needs to be examined. The second point is that the voltage measured by the inputs of the device needs to have similar cycles. If the measured values have too big tolerances or they are zero it means that the connectors are not correctly connected.

     [jg1]Secondary_Burden_test

    Related topics

    • Short-Circuit Impedance Tab capacitor voltage transformer
    • Winding Resistance Test capacitor voltage transformer
    • A Guide for Cvt Test Wiring Using the Instrument Module capacitor voltage transformer
    • Ratio Tab capacitor voltage transformer
    • Excitation Tab capacitor voltage transformer
    • Secondary Burden Test Current Transformer Module
    • Resistance Test Resistance Test
    • Winding Resistance Test Current Transformer Module
    Sharing Window
    Telegram Telegram WhatsApp WhatsApp Eitaa Eitaa FaceBook FaceBook Linkedin Linkedin X X
    Secondary Burden Test
    Tap play once on mobile if autoplay is blocked.
    En Fa De Tr Mu
    MP4
    MP3
    SRT
    DOC