Under Voltage Protection Test in AMR Relay (Simple Test Using Templates)
AMR modular relay of Vebko company supports various protection functions. Explanations of the capabilities and software environment of this relay have already been presented in the video related to differential protection test.
After connecting to the AMR relay at first, simply load the device's hardware configuration from the Device menu by selecting the Read Hardware from Relay option. The default password is 123456 to receive elements. At this point, a message is given to remove the signal, which if confirmed, if the current hardware is not the same as the relay hardware, the current hardware signals used in the VFC section are deleted.
It should be noted that the settings for the conversion ratio of voltage and current transformers are determined in the related card. Here, the current card conversion ratio is 200A to 1A and the voltage card conversion ratio is 63000 to 100V.
(First, enter the VFC page): As mentioned earlier in AMR software, the config of some of the most widely used functions, as an example, are placed in the software as samples; and the user can select any of them apply the desired changes and send the new settings to the relay. For this purpose, a set of functions can be seen in the Relay VFC tab and in the Temp Functions section. It should be noted that by selecting each Temp Function, the available blocks in the VFC are removed.
Here the Under Voltage function displayed with the name UV 27 is selected. In the configure of this function, to calculate the line-by-line voltages, first the relay voltage card signals are assigned to the Voltage Quantities block inputs and then assigned to the Undervoltage block. Also, current card signals connected to the current transformers (CT) of the same feeder are assigned to the Undervoltage block for current monitoring. Finally, undervoltage block output signals are assigned to Binary Outputs and relay LEDs by Output and LED blocks. The purpose is to test the Undervoltage function with AND logic, so the sample of line-by-line voltages are used.
By double-clicking on the Undervoltage block, two stages are defined here. The first stage with a 50V setting and a performance time of 1.5 seconds and a second stage with a 45V setting and a performance time of 1 second. The Drop Ratio value is also 1.2 for both stages by default. Since there is no need for Current Supervision, option I superv. is disabled.
After this, the pickup signals of both stages are removed from the unit with current monitoring and the necessary signals are added to the normal units without current monitoring. In the final step, these changes are applied to the relay to be prepared for testing.
In the next step, by running AMPro software and opening the AMT Under/Over Voltage Test, simply go to the Test Object Parameters section and enter the basic information. Testing this function can also be performed in AMT sequencer room, but in order to make the states and test management more comfortable, this process is performed in the AMT Under/Over Voltage Test.
First, the information is entered in the General Information section. This information can include relay type, serial number and other information such as post name and feeder/b number.
In the Test Setting section, the UV (27) option is selected. Here Vnom sec, 100 volts is selected. Also, the performance mode is located on AND logic to reduce the voltage of all three phases of the specified value to provide the test.
In order to evaluate the performaning of Under Voltage protection, two time tests (Trip time) and Voltage Performance Test (pickup/drop-off) are performed.
Assuming there are two performance stages for Under Voltage protection, regulatory voltage value, voltage type, performance time and more are entered in the Data Table section for both stages of operation. After this, in order to be more accurate in testing, continuous ramp option is selected in state setting section, C1 and C2 contacts are considered for detection of trip and pickup/drop-off, respectively. In addition to contact, the relay pickup status can be recorded with LED or even adjusted to instantaneous Under Voltage protection.
By entering the necessary settings in the Test Plan section, schedule the test in a way that both time test and voltage performance testing are performed. In the Fault Type section, by selecting the L1L2L3 option, states are created for the function test based on the Under Voltage of all three phases. By enabling Time Test, the state related to the performance time check is created. Vtest is the voltage value that the performance of the function in each stage is guaranteed. By selecting yes for PU Test and DOU Test elements, it is confirmed to perform pickup drop-off tests. In the PU Val. Assessment section, the evaluation of the pickup value of the function, in the PU Start section, the initial voltage of the pickup process, in the PU end section, the final voltage limit for the pickup test, and in the DOU End section, the final value for the drop-off test is entered. In the Total section, the total duration of the test is entered.
By Clicking on the Init Test option, creating states will be done based on user-imported settings. These states can be seen in the Table View window. This way, the test can be performed to evaluate the necessary items.
In the Measurement View section, in Assessment ramp tab you can see the assessment of the pickup drop-off and in the Time Assessment tab, you can see the performance time assessments of each stage can be seen.
Keep in mind that when the test reaches the second stage assessment section, a message appears to the user to disable the first stage in order to provide non-interference conditions. This can be done by removing elements related to the first stage from the blocks associated with pickup and trip. Another solution is to equalize the setting of two stages. For this purpose, once again refer to AMR software and set the first stage settings equal to the second stage settings the settings are then to be sent to the relay. In the end, the results are added to the report by clicking on the Add to Report option. These results are visible in the Report window.