• Language
  • VEBKO

  • Introducing the Company and Products
    • Assembling Stages of AMT105 Tester
    • Disperesing Stages of AMT Tester
    • Introducing the Device and Equipment
    • Comparative Analysis of AMT105, AMT205, AMT103, and AMT203 Devices
    • AMPro Software Translation
  • Software Installation and Connection Setting
    • Software Installation
    • How to Connect to AMT
    • Simultaneous Connection of Several Testers
    • Resetting IP Address
    • Updating Firmware of Device Manually
  • Default Setting
    • General Setting of Rooms
    • General Setting of Rooms, Part2
    • Default Setting for “Report”
    • Preferences Page "Directory" & "Cash" Tab
    • "Connection & Firmware"Tab
    • Device Hardware Setting
    • Modifying and Improving the Translation of the Vebko Amirkabir Company Website
    • Power Control and Its Relation to Heat
    • Modifying and Improving AMPro Software Translation
  • Software Home Page
    • General Types of Rooms
    • Software Start Page
  • Modules Toolbar and Statusbar
    • Toolbar and Status Bar, Part 1
    • Toolbar and Status Bar, Part 2
    • “New Based on Custom Template” Option
    • Determining Decimal Numbers, Part 1
    • Determining Decimal Numbers Part 2
    • Analog Output Setting
    • Binary Input Setting, Part1
    • Binary Input Setting, Part2
    • Binary Output’S Setting
    • Extra Setting
    • Relay Specification in Test Object
    • Introducing the “RIO”
    • Introducing “XRIO”
    • XRIO Converter File
    • XRIO Converter, Part2
    • Complementary Explanation About “XRIO Converter”
    • XRIO and XRIO Converter
    • XRIO & Relay Setting in the Software
    • XRIO Converter Formula Writing
    • Writing “XRIO Converter” for an Overcurrent Relay
    • Writing Formula for the “XRIO Converter” 3
    • Writing Formula for “XRIO Converter”4
    • Writing Formula for “XRIO Converter”5
    • Complementary Explanations of “Device” Section
  • AMT Sequencer Module
    • An Introduction to the Sequencer Room
    • “Table View” Window
    • The Separate Toolbar of “Table View” Window
    • “Detail View” Tab
    • Analog Out Tab
    • Quick Type
    • Step Ramp Type
    • Continuous Ramp Type
    • Harmonic State
    • The “Transient” State Type:
    • The “Transient” State (Observing the Impedance Trajectory)
    • The "Transient" State (Observing the Differential Trajectory)
    • “Tracking” State
    • "Set Mode and Fault Type" : Part 1
    • "Set Mode and Fault Type" : Part 2
    • Additional Settings of “Detail View”
    • "Signal View" Window Part 1
    • “Signal View” Window, Part 2
    • “Signal View” Setting, Part 1
    • “Signal View” Setting, Part 2
    • ”Vector View” Window, Part 1
    • “Vector View” Window, Part 2
    • “Vector View” Window, Part 3
    • “Measurement View” Window, Part1
    • “Level Assessment” Tab
    • “Ramp Assessment” Tab
    • “Value Assessment” Tab
    • “Calculated Assessment” Tab
    • "Transient Assessment" Tab
    • Running the Test
    • Start-Condition-Repetition" Window
    • “Report Setting” Window
    • “Report View” Window
    • Advanced Settings of “Report” Part 1
    • Advanced Settings of “Report” Part 2
    • Abilty to Convert Output Binary Voltage to Current and Vice Versa
    • Sampled Value
  • AMT Overcurrent Module
    • Introducing Over Current Room
    • Relay Settings in the "Overcurrent" Room – Part 1
    • Relay Settings in the "Overcurrent" Room – Part 2
    • Relay Settings in “Overcurrent” Room, Part 3
    • Relay Settings in the "Overcurrent" Room – Part 4
    • Test View Window
    • “Pick Up-Drop Off” Window
    • “Overcurrent” Characteristic Curve
    • “Settings” Tab of “Overcurrent” Module, Part 1
    • “Settings” Tab of “Overcurrent” Module, Part 2
    • Directional Earth Fault
    • Complementary Explanation of “Overcurrent” Room
    • Directional Overcurrent
  • AMT VI STARTING Module
    • Introducing “VI Starting” Room
    • “Shot Test” Tab
    • “Check Test” Tab
    • "VI Starting" Room Setting
  • AMT Distance Module
    • Introducing “Distance” Room, Part 1
    • Introducing “Distance” Room, Part 2
    • Introducing “Distance” Room, Part 3
    • Introducing “Testview” Window in “Distance” Room, Part 1
    • “Check Test” Tab
    • “Search Test” Tab
    • “Distance” Room Settings, Part 1
    • “Distance” Room Settings, Part 2
    • Impedance View Window
    • “Zt Diagram” and “Medium Detail View” Windows
    • Grounding Factor in Distance
    • Distance Protection Voltage and Current Calculations in the Test Room
  • AMT Differential Module
    • Relay Settings in “Differential” Room, Part 1
    • Relay Settings in “Differential” Room, Part 2
    • Introducing “Test View” Window in “Differential” Room, Part 1
    • Introducing “Test View” Window in “Differential” Room, Part 2
    • “Differential” Room Settings
    • “Differential Characteristic” Window
    • No Combined Characteristic
    • Zero Sequence Elimination
    • Restricted Earth Fault
  • AMT Diff Harmonics Module
    • Introducing “AMT Diff. Harmonics” Room
    • “Test View” Window
    • “Setting” Tab
    • “Harmonic Restraint View” Window
  • AMT Transducer Module
    • “Offload” Test Part 1
    • “Offload” Test Part 2
    • “Onload” Test of the Meter
    • Transducer Test
    • How to Use the Optical Pulse Sensor in Meter Testing
  • AMT Synchronizer Module
    • An Introduction to AMT Synchronizer
    • Test View Window in Synchronizer Room
  • AMT VCC Room
    • AMT VCC Room
  • Current Transformer Module
    • Introducing “Current Transformer (CT)” Room
    • Secondary Burden Test
    • Winding Resistance Test
    • “Excitation Test” Tab, Part 1
    • “Excitation Test” Tab, Part 2
    • CT “Excitation Test”, Part 3
    • CT Excitation Test, Part 4
    • Other Tests Performable in “Excitation Test” Tab
    • CT Ratio and Polarity Test with Current Method
    • CT Ratio and Polarity Test (with Voltage)
    • CT Test Wiring Guide Using the Instrument Module
    • CT and PT Turns Ratio
    • Estimating FS and ALF for Various CTs
  • Circuit Breaker Module
    • Introducing “Circuit Breaker(CB)” Room
    • CB “Timing Test”
    • “Contact Resistance” Tab
    • Circuit Breaker Operation Minimum Voltage Test:
    • A Guide for Performing CB Test Connections Using the Instrument Module
  • capacitor voltage transformer
    • Capacitive Voltage Transformers
    • Secondary Burden Test
    • Short-Circuit Impedance Tab
    • Winding Resistance Test
    • Excitation Tab
    • CVT Ratio2
    • Ratio Tab
    • A Guide for Cvt Test Wiring Using the Instrument Module
  • Transformer Module
    • Introducing “Transformer” Room
    • “Vector Group, Turns Ratio and No Load” Tab
    • “Magnetic Balance” Tab
    • “Winding Resistance” Tab
    • “Leakage Reactance“ Tab
    • “Demagnitize” Tab
    • Guide to Performing Transformer Test Using Instrument Module
    • Zero Sequence Elimination
    • How to Use Clamps in Transformer Testing
  • OverCurrent Quick Test Room
    • Overcurrent Quick Test Room
  • Under OverVoltage Test Room
    • Under Over Voltage Test Room
  • AMT AR Room
    • AMT Ar Room
  • Resistance Test
    • Resistance Test
  • Troubleshooting
    • The Complete Main Switching
    • Main Switching Error Overcurrent Board
    • Overcurrent Error of Board 2 Part 1
    • Overcurrent Error Board 2 Part2
    • Switching Troubleshooting
    • OC Board IGBT Test
    • Introducing the Internal Modules Part1
    • Introduceing Internal Modules Part2
    • Introducing Internal Modules Part3
    • Switching Module
    • Possible Errors in the Switching Module
    • Checking the Parts,in Switching Module Errors Part1
    • Checking the Parts,in Switching Module Errors Part2
    • Checking the Parts,in Switching Module Errors Part3
    • The Connections Between the Switching Module and the Amplifier
  • Testing of relays protection functions
    • End-to-End Test
    • Overvoltage Protection Function Test in MICOM P141 Relay
    • Undervoltage Protection Function Test in MICOM P141 Relay
    • Directional Overcurrent Protection Function Test in MICOM P141 Relay
    • Directional Earth Fault (DEF) Protection Function Test in MICOM P141 Relay
    • New End-to-End Test
    • Drawing the Distance Characteristics and Practical Example of Drawing the Quad Characteristic in Siemens 7SA522 Relay
    • Drawing the Load Encroachment Characteristic
    • Drawing the Mho Characteristic in GEC PYTC Relay
    • Synchronizer Function Test in SIPROTEC Siemens 7SD82 Relay
    • 51V Function Test in Siemens 7SD82 Relay
    • Non-Directional Overcurrent Protection Test in AMR Relay (Simple Test Using Templates)
    • Under Voltage Protection Test in AMR Relay (Simple Test Using Templates)
    • Overvoltage Protection Test in AMR Relay (Simple Test Using Templates)
    • Negative Sequence Overcurrent Protection Test in AMR Relay (Simple Test Using Templates)
    • Directional Overcurrent Protection Test in AMR Relay (Simple Test Using Templates)
    • Non-Directional Overcurrent Protection Test in AMR Relay (Simple Test Using Templates)
    • Distance Protection Test in AMR Relay (Simple Test Using Templates)
    • Differential Protection Test in AMR Relay (Simple Test Using Templates)
    • Rogowski Coil Test
  • ZA
  • Goose Messaging Testing
    • GOOSE Messaging Testing
  • Trust the Software
    • Guide to Trusting Vebko(Stable-Test) Software in Bitdefender Antivirus
    • Guide to Trusting Vebko(Stable-Test) Software in Kaspersky Antivirus
    • Guide to Trusting Vebko(Stable-Test) Software in NOD32 Antivirus
  • PMU Test
    • PMU Test
  • ZE
  • Introdusing Company and Produces
    • Assembly Stages of AMR Relay
  • Software Download and Installation
    • Software Installation
  • Software Homepage and Create Project
    • Login to the Main Environment of the Software
  • Connection and Update Firmware
    • Connect with Relay
    • Firmware Relay Update
  • Relay Hardware
    • Relay Hardware Module
    • Voltage and Current Transformers Data
  • AMR Relay Test
    • Differential Protection Test in AMR Relay (Simple Test Using Templates)
    • Directional Overcurrent Protection Test in AMR Relay (Simple Test Using Templates)
    • Negative Sequence Overcurrent Protection Test in AMR Relay (Simple Test Using Templates)
    • Distance Protection Test in AMR Relay (Simple Test Using Templates)
    • Non-Directional Overcurrent Protection Test in AMR Relay (Simple Test Using Templates)
    • Overvoltage Protection Test in AMR Relay (Simple Test Using Templates)
    • Under Voltage Protection Test in AMR Relay (Simple Test Using Templates)
  • Real Testing Requires Realistic Signals
  • AMPro Protocol Sniffer
  • Meet SV100+
  • IEC 61850 Sampled Values Testing
  • Digital substations run at the speed of light
  • Don’t Just Test Your Relays. Simulate the Grid
  • Smart Configuration Inheritance in VCC — With Full Control
  • Control What Appears in Your Test Report
  • From Comtrade to Inject
  • Design and Navigate Complex Test Procedures with the AMPRO Sequencer
  • One State. Four Transitions. Total Control
  • Stop waiting for the test to finish
  • Balanced System, Zero Trip, Infinite Confidence
  • Defining Complex Logic For Assessments
  • Advanced Assessments
  • Vebko Around The World
  • Noise Suppression in Transformer Turns Ratio
  • Relay Data in Quick Access
  • Wiring Clarity - Without Leaving Your Workspace
  • Design and Navigate Complex Test Procedures with the AMPRO Sequencer
  • Flexible Connectivity with AMT205 in AMPRO
  • Simultaneous Ramp on All Outputs [AMT205]
  • Continuous Ramp Capability [AMT205]
  • Distance Search Testing
  • Comprehensive Circuit Breaker Testing [AMT205]
  • Smarter Configuration In VCC File
  • New Feature In Vebko AMPro
  • Vebko Educational Videos
  • Contact Resistance Measurement
  • Test With Confidence
  • Control Your Report
  • One Device, Any Relay
  • DC Resistance Measurement
  • History of Amt105 GPS
  • History of Amt105 Wifi
  • AMT 105 Features
  • Catalog
    • Catalog All
    • Accessories
    • Agencies
    • Catalog
    • Hardware
  • PDF Download PDF
    0 / 0

    Disperesing Stages of AMT Tester

    First, turn the device upside down so that the base are upwards, we then open the case base using Allen wrench 3. After separating the base, separate the 4 screws connected to the case doors.

    Now the case doors are released and we need to remove the earth cables that are attached to the door.

    Next, put the base in its own place then open the nuts for the GPS antenna and the dongle port and return the case over.

    Now open the 14 screws in the front panel then release the green connectors attached to the panel (Phoenix).

    After phoenixes, it is time to release the flat panel cable and the toggle is pulled from the sides of the free cable, separated from the panel. In the next step, we release the 4 sockets attached to the key and 1 socket attached to the earth panel, now the front panel comes out of the case easily.

    First, we remove the cable (earth). To remove the cables, you must first cut all belt clamps. Separate the holders attached to the phoenixes, then remove the latched flat cable by pressing the toggles.

    In the next step, to separate the holder related the Neutrik, use Allen wrench 3, two screws attached to the holder, box wrench 5.5, open the nut attached to the holder and remove the screw attached to the right switch bracket. Remove the twin screws with Allen wrench 3.

    The blue and brown wires are then connected to each side of the circuit, first cutting the bracket and then the phoenix 2-pin connector.

    Open the 4 holders on the middle rail using allen wrench 2 and then go to the other side of the device and seprate the 2 earth cables from the device and release the holder related to the flat at the bottom of the device on the right side using a screwdriver. Seprate the other side that has a latch by releasing the latch from the device.

    Cut the belt clamps, releasing cables from Phoenix using a screwdriver.

    In the next step, release the flat cable holders attached to the switch, pull the flat back and separat it.

    Disconnect the Neutrik board connected to the amplifier and open the 2 Neutrik holder that is attached to the case body using Allen wrench 3 and the nut under the Neutrik board with a 5.5 box wrench.

    Remove the flat panel holder then release the flat, finally, open the holder that connects the switching to the case by 2 screws with Allen wrench 3 and separate it.

    Open the screws for 4 holders on the middle rail using Allen wrench 2; then open the screw on the micro holder with Allen wrench 2 and remove the holder.

    Finally, all the cables and screws are opened; the amplifier and switching module are freed and the fan sockets are released once ejected and easily removed from the case.

    Disperesing_Stages_of_AMT105_Tester

    Related topics

    • Assembling Stages of AMT105 Tester Introducing the Company and Products
    • Overcurrent Error Board 2 Part2 Troubleshooting
    • Introducing the Device and Equipment Introducing the Company and Products
    • OC Board IGBT Test Troubleshooting
    • Switching Module Troubleshooting
    • Assembly Stages of AMR Relay Introdusing Company and Produces
    • Checking the Parts,in Switching Module Errors Part3 Troubleshooting
    • Checking the Parts,in Switching Module Errors Part2 Troubleshooting
    Sharing Window
    Telegram Telegram WhatsApp WhatsApp Eitaa Eitaa FaceBook FaceBook Linkedin Linkedin X X
    Disperesing Stages of AMT Tester
    No playable video is currently available.
    En Fa De Tr Mu
    MP4
    MP3
    SRT
    DOC