﻿1
00:00:19,484 --> 00:00:23,307
Overvoltage protection test in AMR relay (simple test using templates)

2
00:00:23,721 --> 00:00:29,826
AMR modular relay of Vebko company supports various protection functions.

3
00:00:29,887 --> 00:00:38,543
Explanations of the capabilities and software environment of this relay have already been presented in the video related to differential protection test.

4
00:00:38,568 --> 00:00:41,625
‫After connecting to the AMR relay at first,

5
00:00:41,650 --> 00:00:48,585
simply load the device's hardware configuration from the Device menu by selecting the Read Hardware from Relay option.

6
00:00:48,871 --> 00:00:54,654
The default password is 123456 in order to receive elements.

7
00:00:55,188 --> 00:01:00,441
At this point, a message is given to remove the signal, which if confirmed,

8
00:01:00,621 --> 00:01:04,317
if the current hardware is not the same as the relay hardware,

9
00:01:04,342 --> 00:01:10,007
the current hardware signals used in the VFC section are deleted.

10
00:01:10,235 --> 00:01:18,036
It should be noted that the settings for the conversion ratio of voltage and current transformers are determined in the related card.

11
00:01:18,043 --> 00:01:28,407
Here, the ratio of the current card conversion is 200A to 1A and the voltage card conversion ratio is 63,000 to 100V.

12
00:01:28,488 --> 00:01:31,421
(First, enter the VFC page):

13
00:01:31,461 --> 00:01:34,261
As mentioned earlier in the AMR software,

14
00:01:34,294 --> 00:01:38,945
configuring some of the most widely used functions as examples are placed in the software and

15
00:01:38,965 --> 00:01:46,899
the user can send new settings to the relay by selecting each of them and applying the desired changes.

16
00:01:46,953 --> 00:01:53,970
For this purpose, a set of functions can be seen in the Relay VFC tab and in the Temp Functions section.

17
00:01:54,017 --> 00:02:00,484
It should be noted that by selecting each Temp Function, the blocks in the VFC are removed.

18
00:02:00,578 --> 00:02:06,160
Here the overvoltage function displayed with the name OV 59 is selected.

19
00:02:06,367 --> 00:02:11,275
In the config of this function, first to calculate the line-by-line voltages,

20
00:02:11,329 --> 00:02:19,329
the relay voltage card signals are assigned to the Voltage Quantities block inputs and then assigned to the Overvoltage block.

21
00:02:19,736 --> 00:02:27,723
Finally, overvoltage output signals are assigned to Binary Output and relay LEDs by Output and LED blocks.

22
00:02:27,750 --> 00:02:33,080
Since the purpose is to test the overvoltage function with OR logic,

23
00:02:33,261 --> 00:02:38,927
analog signals related to the voltage sample must be applied directly to the overvoltage

24
00:02:38,968 --> 00:02:44,442
block to increase the voltage of each phase, the relay function should occur.

25
00:02:44,489 --> 00:02:49,289
By double-clicking the Overvoltage block, two stages will be defined here.

26
00:02:49,302 --> 00:02:59,489
The first stage with a 65V set and a performance time of 2 seconds and a second stage with a 70V set and a performance time of 4 seconds.

27
00:02:59,529 --> 00:03:06,942
Also, Operation Quantity is placed on Vphn/V1/V2 to include single-phase performance.

28
00:03:07,054 --> 00:03:10,874
Finally, the changes will be sent to the relay.

29
00:03:14,821 --> 00:03:20,875
In the next step, by running AMPro software and opening the AMT Under/Over Voltage Test,

30
00:03:20,895 --> 00:03:25,989
simply go to the Object Parameters test section and enter the basic information.

31
00:03:26,010 --> 00:03:30,359
Testing this function can also be performed in AMT sequencer room,

32
00:03:30,384 --> 00:03:34,287
but in order to make the states and test management more comfortable,

33
00:03:34,314 --> 00:03:39,858
this process is performed in the AMT Under/Over Voltage Test.

34
00:03:40,312 --> 00:03:44,500
Firstly, the information is entered in the General Information section.

35
00:03:44,687 --> 00:03:52,664
This information can include relay type, serial number and other information such as post name and feeder/b number.

36
00:03:52,924 --> 00:04:01,175
In the Test Setting section, the OV (59) option is selected. Here Vnom sec, 100 volts is selected.

37
00:04:01,208 --> 00:04:10,597
Also, the performance mode is located on the OR logic to increase the voltage of each phase from the specified value to provide the test.

38
00:04:10,637 --> 00:04:14,297
In order to evaluate the performance of overvoltage protection,

39
00:04:14,321 --> 00:04:17,713
two time tests (Trip time) and Voltage Performance Test (pickup/drop-off) are performed.

40
00:04:17,754 --> 00:04:23,881
Assuming two performance stages for overvoltage protection, regulatory voltage value, voltage type,

41
00:04:23,906 --> 00:04:31,048
performance time and more are entered in the Data Table section for both stages of operation.

42
00:04:31,195 --> 00:04:34,009
After this, in order to be more accurate in testing,

43
00:04:34,023 --> 00:04:40,076
continuous ramp option is selected in state setting section and C1 and C2

44
00:04:40,080 --> 00:04:46,437
contacts are considered for diagnosis of trip and pickup/drop-off, respectively.

45
00:04:46,625 --> 00:04:56,047
The status of the relay pickup can be recorded with LED in addition to contact, or even adjusting to instantaneous over-voltage protection.

46
00:04:56,134 --> 00:04:59,879
By entering the necessary settings in the Test Plan section,

47
00:04:59,899 --> 00:05:06,675
schedule the test in a way that both time test and voltage performance testing are performed.

48
00:05:06,722 --> 00:05:11,858
In fault type, by selecting L1E, L2E and L3E,

49
00:05:11,912 --> 00:05:18,700
states are created to test the function based on the voltage increase of each phase independently.

50
00:05:19,274 --> 00:05:24,856
By enabling Time Test, the state related to the performance time check is created.

51
00:05:25,150 --> 00:05:31,928
Vtest is the voltage value at which the performance of the function in each stage is guaranteed.

52
00:05:32,359 --> 00:05:37,546
By selecting yes for PU Test and DOU Test elements,

53
00:05:37,587 --> 00:05:42,380
it will be confirmed to perform pickup drop-off tests. In the PU Val.

54
00:05:42,409 --> 00:05:49,060
Assessment section, the evaluation of the pickup value of the function, in the PU Start section,

55
00:05:49,082 --> 00:05:52,746
the initial voltage of the pickup process, in the PU end section,

56
00:05:52,806 --> 00:06:01,322
the final voltage limit for the pickup test, and in the DOU End section, the final value for the drop-off test is entered.

57
00:06:01,369 --> 00:06:05,242
In the Total section, the total duration of the test is entered.

58
00:06:05,249 --> 00:06:12,136
By Clicking on the Init Test option, creating states will be done based on user-imported settings.

59
00:06:12,170 --> 00:06:15,827
These states can be seen in the Table View window.

60
00:06:15,901 --> 00:06:20,125
In this way, can perform the test to evaluate the necessary items.

61
00:06:22,982 --> 00:06:24,638
In the Measurement View section,

62
00:06:24,645 --> 00:06:31,173
Assessment ramp tab you can see the assessment of the pickup drop-off and in the Time Assessment tab,

63
00:06:31,182 --> 00:06:35,724
you can see the performance time assessments of each stage.

64
00:06:44,162 --> 00:06:49,090
Keep in mind that when the test reaches the second stage assessment section,

65
00:06:49,172 --> 00:06:57,108
a message has appeared to tell the user to disable the first stage in order to provide the conditions for non-interference.

66
00:06:57,163 --> 00:07:01,685
This can be done by removing elements related to the first stage from the blocks

67
00:07:01,739 --> 00:07:03,939
associated with pickup and trip.

68
00:07:04,114 --> 00:07:08,361
Another solution is to equalize the setting of two stages.

69
00:07:08,361 --> 00:07:19,647
For this purpose, once again refer to AMR software and set the first stage equal to the second stage settings and the settings will be sent to the relay.

70
00:07:34,705 --> 00:07:40,287
In the end, the results are added to the report by clicking on the Add to Report option.

71
00:07:40,327 --> 00:07:43,655
These results will be visible in the Report window.
