‪One of the most essential tests to be performed on the lines that are protected by relays on both sides is an "End to End" test

2
00:00:35,187 --> 00:00:43,266
‪To perform this test, both devices on the sides of the line must be synchronized and inject the required signals into the relays simultaneously

3
00:00:43,291 --> 00:00:45,639
‪The first step is the stability test

4
00:00:45,673 --> 00:00:48,716
‪There are two things to consider for this test:

5
00:00:48,741 --> 00:00:52,990
‪first, the transformation ratio of CTs and second, the polarity of CTs

6
00:00:53,015 --> 00:01:03,190
‪For example, suppose that the transformation ratio of CT in post A is 1000/1 and in post B is 800/1 and the polarity of both posts is toward object

7
00:01:03,215 --> 00:01:13,599
‪If the current in the line is assumed to be 1000 amps, then the current of the relays of the post A and post B will be 1 and 1.25 amperes respectively

8
00:01:13,876 --> 00:01:21,695
‪Also because the polarity of both CTs is toward object, there will be a 180 degree phase difference in the corresponding phases

9
00:01:21,720 --> 00:01:25,908
‪The "AMT Sequencer" room is used for performing the stability test

10
00:01:25,933 --> 00:01:29,159
‪In this room, 6 current phases must be activated

11
00:01:29,184 --> 00:01:34,138
‪To do this, go to the "Hardware Configuration" page and deactivate the voltage phases

12
00:01:34,163 --> 00:01:39,497
‪Then all the 6 current phases will be activated in the "Current Output Signal" section

13
00:01:42,944 --> 00:01:46,190
‪Considering what was said in the preceding example

14
00:01:46,215 --> 00:01:56,716
‪3 balanced 1 amp phase current and three balanced 1/25 amp phase which have a 180 degree phase difference with their corresponding phase toward each other

15
00:01:56,741 --> 00:01:59,000
‪, will be entered in the "Table View" tab

16
00:01:59,025 --> 00:02:03,010
‪Injecting these currents into the relays will take 100 seconds

17
00:02:04,672 --> 00:02:11,039
‪During this time, the "Idiff" of the relay, visible on the measurement panel in front of the relay, must be zero

18
00:02:17,553 --> 00:02:26,318
‪The second step is the characteristic curve test. In this room, first, the 'XRio" file of the differential relay which is being tested will be imported

19
00:02:30,450 --> 00:02:37,318
‪To do this, go to the "Test Object" page and click on the "Import from list" option to open the "Template" list of the relays

20
00:02:38,454 --> 00:02:44,146
‪For example, "7sd" is searched and its "Template" is selected

21
00:02:47,234 --> 00:02:56,866
‪Then from the "File" menu, click on "Load Relay Setting" and the "XRio" of the relay of the post A which is exported from the "DIGSI" software is entered

22
00:02:59,937 --> 00:03:08,316
‪A very important point to note in this section is that,also, the post B relay settings should be entered in the "XRio" of the post A relay

23
00:03:08,616 --> 00:03:19,962
‪. Because the curve of the differential of this relay is related to the settings of both relays, it is necessary that the settings of both relays is available in one file so that the curve is created correctly

24
00:03:19,987 --> 00:03:25,922
‪To do this, open "XRio" from the subdirectory of "7sd" and then open "Additional Information"

25
00:03:25,947 --> 00:03:29,372
‪After that, select "Relay Parameter Section (Remote Relay)”

26
00:03:29,821 --> 00:03:39,574
‪In this section, in order to enter the information of the other side, the information of the parameters that are green in the "State" column, must be entered in the "XRio" of the relay

27
00:03:43,182 --> 00:03:51,647
‪This information can be entered in two ways: if the file of the relay is available in the "DIGSI" software, the information is imported from the software

28
00:03:51,731 --> 00:03:56,946
‪Otherwise, the other person in the post B should read this information from the relay and announce it

29
00:03:57,269 --> 00:04:02,722
‪After entering the information, the characteristics of the curve of the relay will be created in the post A

30
00:04:02,747 --> 00:04:15,523
‪vThe same steps are taken from the "Import from list" point to the end in the post B and in the "Additional information" section, the relay information of the Post A must be entered so that the curve is created in the Post B too

31
00:04:17,162 --> 00:04:22,864
‪By double-clicking on the "Line Differential" option, the "Differential Protection Parameters" page opens

32
00:04:22,889 --> 00:04:34,207
‪The point to note on this page is to enter the post A relay information in both posts A and B of the "Primary" Column and enter relay information of the post B in the "Secondary" column

33
00:04:37,022 --> 00:04:46,781
‪It should also be noted that the information of "Protection Device" tab, "Idiff" section and also "Characteristic Definition" tab must be exactly the same on both sides

34
00:04:46,806 --> 00:05:02,798
‪After the relay curve is made, the person on the side of the relay A must flow the 3 upper phases and short circuit the lower 3 phases. Meanwhile, the person on the side of the relay B must flow the 3 lower phases and short circuit the 3 upper phases of the current

35
00:05:05,071 --> 00:05:16,404
‪Once the curve is made and it has been made sure that everything is the same on both sides, such as transformer's differential test and "Check" test, then the "Shot" and "Search" is performed

36
00:05:18,276 --> 00:05:27,955
‪The point is that every test and "Fault Type" which is added to the test table on one side, must be exactly repeated, with the same values, on the other side in the "Fault Type"

37
00:05:27,980 --> 00:05:33,058
‪To perform this test, it is necessary to perform the test simultaneously on both sides

38
00:05:33,113 --> 00:05:38,711
‪For this purpose, it is essential to connect the "GPS" antenna to the back of both devices first

39
00:05:38,808 --> 00:05:45,076
‪Then go to the "Start-Condition Repetition" page and select "On GPS" option in the "Start Condition" tab

40
00:05:45,436 --> 00:05:52,045
‪On this page, by activating the "Start Time" option, both devices show a specific time in the time field on their front

41
00:05:51,996 --> 00:06:00,365
‪By doing this, both devices will, at the specified time, simultaneously start injecting the flow to run the test and recording the results
