Circuit Breaker Operation Minimum Voltage Test:

2
00:00:21,392 --> 00:00:28,140
One of the most important tests that can be performed on circuit breakers is the “Circuit breaker operation minimum voltage test”

3
00:00:28,165 --> 00:00:33,265
or “Minimum Voltage” which is performed in “Minimum Voltage to Operate Circuit Breaker” tab.

4
00:00:33,290 --> 00:00:43,359
In this test, it is possible to find the minimum voltage which can cause the circuit breaker to operate by gradually increasing the voltage applied to the two ends of “Open” or “Close” bobbin.

5
00:00:43,384 --> 00:00:44,882
In the first step of this test,

6
00:00:44,915 --> 00:00:56,015
the equipment to be used in the test is selected from among “New Device” and “AMT105” which is set at “AMT105” by default and here we proceed without changing it.

7
00:00:56,040 --> 00:01:02,273
Then you need to specify that whether you are going to perform a “Close” test or an “Open” test.

8
00:01:02,306 --> 00:01:11,114
Note that since some circuit breakers have two “Open” and two “Close” bobbins, there are “Open1” and “Open2” as well as “Close1” and “Close2”.

9
00:01:11,139 --> 00:01:17,101
In this video we are going to perform the minimum voltage test once for “Close” mode and once more for “Open” mode.

10
00:01:17,134 --> 00:01:26,476
As the next step, you need to specify that whether the device is to detect the circuit breaker operation based on the contact reception or current drop;

11
00:01:26,570 --> 00:01:31,593
in this video we are using the former which is a more accurate and reliable method.

12
00:01:31,618 --> 00:01:40,639
In this method you can also specify that whether the test is to be performed in three-phase or single phase mode; here three-phase is selected.

13
00:01:40,664 --> 00:01:47,273
“Wet” is selected as the contact type so that noises cannot cause any dysfunction in the process.

14
00:01:47,298 --> 00:01:52,257
Note that by selecting any of the options in this section, the wiring changes.

15
00:01:52,282 --> 00:01:57,593
For example, if single phase or “Dry” are selected, you can see the change in the wiring.

16
00:01:57,618 --> 00:02:02,709
In this test two methods are available to apply voltage to stimulate the bobbin.

17
00:02:02,734 --> 00:02:10,373
Using the “Manual” method, you specify a particular voltage and after pressing “Init Test”, apply that to the circuit breaker.

18
00:02:10,398 --> 00:02:18,453
But in “Pulse Ramping” method you can increase the voltage gradually and find the minimum voltage which can cause the circuit breaker to operate.

19
00:02:18,478 --> 00:02:27,443
By selecting “Pulse Ramping”, a graphic figure is displayed whose different parameters must be specified. Let us explain this with an example.

20
00:02:27,468 --> 00:02:42,992
In this example the voltage is increased from 35 to 80 volts with 0.5 volt steps and each step takes 0.5 second. The value for “Reset” voltage is 5 volts and its application time is considered to be 0.5 second.

21
00:02:43,017 --> 00:02:48,578
After specifying these factors, the wiring is done according to the guide available in the picture.

22
00:02:48,603 --> 00:02:55,390
In this wiring, first, the two voltage sources are paralleled in order to use the maximum current of the device,

23
00:02:55,415 --> 00:03:00,054
and then they are connected to the control coil to apply the fed voltage.

24
00:03:00,079 --> 00:03:04,156
Afterward, in accordance with the number of contacts selected, (3 is selected in this test)

25
00:03:04,181 --> 00:03:12,054
L1, L2 and L3 contacts are connected to Binary Inputs to record the operation of the circuit breaker.

26
00:03:44,008 --> 00:03:52,099
After selecting “Coil Close1” and adjusting the wiring, “Init Test” is selected and the test is run.

27
00:03:52,194 --> 00:03:59,030
By opening the “Signal View” window you can view the applied voltage as well as the injected current.

28
00:03:59,302 --> 00:04:08,682
After the circuit breaker operates, the minimum operation voltage along with the amount of current drawn during the operation is displayed in “Result” section.

29
00:04:08,707 --> 00:04:13,973
By selecting “Add to Report” the test result is added to the output report.

30
00:04:14,067 --> 00:04:25,067
To test the “Open” bobbin of the circuit breaker, “Coil Open1” is selected and after pressing ‘Init Test” the test is rerun and the results are added to the output report.

31
00:04:50,628 --> 00:04:59,706
In using the “Coil current” method the wiring is changed and the circuit breaker operation is detected based on the current drawn from the resource.

32
00:04:59,731 --> 00:05:08,417
You need to specify the minimum current which is drawn from the device when the circuit breaker operates in “Min Coil Current” field.

33
00:05:08,442 --> 00:05:16,026
Here .9m amp is selected. For “Pulse Ramping” the same settings used in the previous example are used.

34
00:05:16,051 --> 00:05:22,544
After adjusting the wiring and pressing “Init Test” the test is run.

35
00:05:34,435 --> 00:05:40,135
In “Signal View” you can see that for every “Pulse”, current is drawn from the device

36
00:05:40,160 --> 00:05:51,214
and in current 36.68mA And voltage 16.3v the test result is achieved and the results are recorded in “Result”.

37
00:05:51,239 --> 00:05:55,964
The results of this test are added to the report by selecting “Add to Report”.

38
00:05:56,008 --> 00:06:03,581
Post “DC” resource test: it is possible to perform the post “DC” resource test in “Check DC Ground” section.

39
00:06:03,606 --> 00:06:11,903
In posts whose potential difference is provided by two resources, it is possible to examine the parallelism of the two.

40
00:06:11,928 --> 00:06:20,583
For example, if the post uses a positive 100 volts and a negative 100 volts resource to provide 200 volts of “DC” potential difference,

41
00:06:20,615 --> 00:06:28,514
by performing this test, it is possible to examine that how much is each of these two potentials deflected from the intended 100 volts.

42
00:06:28,539 --> 00:06:35,561
To do this test, you need to specify the nominal voltage and maximum allowed tolerance after checking “Check DC Ground”.

43
00:06:35,586 --> 00:06:42,873
Here “100 volts” and “%10” are entered as the required values and then the wiring is adjusted in accordance with the figure.

44
00:06:42,898 --> 00:06:45,928
After pressing “Init Test” and running the test,

45
00:06:45,953 --> 00:06:53,295
the positive potential difference and its difference with “Nominal Voltage”, “Negative Voltage” and “Negative Voltage dev”

46
00:06:53,320 --> 00:06:59,092
as well as the negative potential and its difference with “Nominal Voltage” are displayed.

47
00:06:59,117 --> 00:07:07,521
“Check Corresponding”: since in some electrical installations multiple voltage resources are used to supply different equipment,

48
00:07:07,553 --> 00:07:17,685
it may be necessary to test the positive and negative potential of the existing cables so that no mistake occurs in terms of positive and negative potentials.

49
00:07:17,710 --> 00:07:25,654
For this test, the maximum voltage allowed between the two poles of the two resources is entered in “Voltage Drop” field.

50
00:07:25,679 --> 00:07:31,562
To be precise, suppose that two resources of “A” and “B” are being used to supply the equipment.

51
00:07:31,587 --> 00:07:39,364
Normally there should not be any potential difference between the positive “A” and negative “B” sides of the resources.

52
00:07:39,389 --> 00:07:47,833
If there is any potential difference between these two it means that they both belong to the same resource and can be used to supply the equipment.

53
00:07:47,858 --> 00:07:53,309
“Check Short Circuit”: by doing this test you can test the health of a bobbin.

54
00:07:53,334 --> 00:08:01,035
To do so you need to specify a voltage and a reference resistance in “Voltage” and “Rref” fields respectively.

55
00:08:01,060 --> 00:08:03,887
After doing the wiring and running the test,

56
00:08:08,809 --> 00:08:17,449
the drawn current is measured and then the applied voltage is divided by the drawn current and the self-resistance is calculated.

57
00:08:17,479 --> 00:08:25,612
If this resistance is smaller than the reference resistance specified in “Rref” field, it means that the self is short circuited.

58
00:08:25,637 --> 00:08:33,956
Since it may happen that some users have also performed “Megger” test for this equipment and they wish to have the results in a report,

59
00:08:33,996 --> 00:08:44,283
in this tab they can create their intended table by selecting their desired row and column and then “Insert”; after entering the test results and selecting “Add to Report”,

60
00:08:44,322 --> 00:08:47,440
the information will be added to the output report.

61
00:08:47,472 --> 00:09:01,060
Other options include “Delete Report” which is used to delete the information of this page from the report as well as “Export” and “Import” options which are used to export the information of this page or import them if necessary.

62
00:09:01,085 --> 00:09:12,614
Also, if you wish to set the characteristics entered for the created row and column as the default for this section of the room you can use “Set as Default” option.
