﻿1
00:00:19,201 --> 00:00:21,770
Offload test second part

2
00:00:21,795 --> 00:00:28,435
In addition to the tests that the user can perform by specifying different points on the energy meter characteristic,

3
00:00:28,460 --> 00:00:34,177
in the offload section, 5 other tests are availabe in this section as follows:

4
00:00:34,202 --> 00:00:35,434
Load Test

5
00:00:35,459 --> 00:00:36,732
Mechanism Test-

6
00:00:36,757 --> 00:00:37,997
Injection Test-

7
00:00:38,022 --> 00:00:39,373
No-Load Test-

8
00:00:39,398 --> 00:00:40,683
Creep Test-

9
00:00:40,708 --> 00:00:44,833
As mentioned in the first part, before performing any of the tests,

10
00:00:44,858 --> 00:00:49,615
we enter the information about the energy meter in the Test Object section.

11
00:00:49,640 --> 00:00:57,122
First, enter the CT and PT conversion ratio data, and then, in the Transducer Properties section,

12
00:00:57,147 --> 00:00:59,419
enter the meter constant.

13
00:00:59,444 --> 00:01:02,537
After confirming the entered information,

14
00:01:02,562 --> 00:01:08,944
select the test from the Test Mode to be performed and after adding the points, run the test.

15
00:01:08,969 --> 00:01:10,099
Load Test

16
00:01:10,124 --> 00:01:16,779
In this section, the voltage injection and current for a specific time is set to evaluate the number of pulses.

17
00:01:16,804 --> 00:01:21,951
Finally, the overall energy performance of the meter can be checked.

18
00:01:22,273 --> 00:01:28,537
 The purpose of this test is to evaluate the error rate for measuring different elements in the meter.

19
00:01:28,696 --> 00:01:38,208
To execute the test, first go to the Advanced View section, here we need to adjust the active power in the supported range of energy meter.

20
00:01:38,233 --> 00:01:43,654
Then, we add three points with 5, 10, 15 pulses to run the test, and we run the test.

21
00:01:43,679 --> 00:01:48,294
As you can see in the Test Point section, information about watt-hour,

22
00:01:48,319 --> 00:01:53,496
pulses, test duration and time and its frequency can be set.

23
00:02:02,672 --> 00:02:04,163
Mechanism Test

24
00:02:04,188 --> 00:02:13,034
In this section, the injection of rated current and rated voltage is done for a certain period of time to evaluate the amount of transmission energy.

25
00:02:13,059 --> 00:02:18,393
The purpose of this test, in addition to evaluating the error rate in the overall measurement,

26
00:02:18,418 --> 00:02:22,869
is to evaluate the error rate of the device in measuring various elements.

27
00:02:22,898 --> 00:02:31,145
Since the number of pulses is not important, points can be entered for testing based on watt-hour and time elements.

28
00:02:31,170 --> 00:02:38,706
The evaluation conditions of this test are based on the use of the Open Loop feature so that at the end of the test,

29
00:02:38,731 --> 00:02:41,825
the user can enter the measured value manually.

30
00:02:41,850 --> 00:02:43,111
Injection Test

31
00:02:43,136 --> 00:02:52,036
In this test, voltage and current are continuously injected to ensure the accuracy of the wiring as well as the initial function of the meter.

32
00:02:52,061 --> 00:02:58,708
Adjustable elements in the Test Point section for this test are: watt-hour,

33
00:02:58,733 --> 00:03:02,754
pulses, test duration and time, and frequency.

34
00:03:02,779 --> 00:03:07,324
To perform the test, add a dot and run the test.

35
00:03:14,994 --> 00:03:16,982
No-Load Test

36
00:03:17,007 --> 00:03:25,941
The focus of this test is injecting 150% of the rated voltage and zero current; to check the performance or non-performance of the meter.

37
00:03:25,966 --> 00:03:30,652
The relationship between the minimum test duration is specified as follows:

38
00:03:30,677 --> 00:03:38,621
In this test, to achieve 150% of the rated voltage, the voltage limit should be changed from the Test Object section,

39
00:03:38,646 --> 00:03:39,668
if necessary.

40
00:03:39,693 --> 00:03:46,293
Then, the test should be performed by setting the voltage to 150% of the rated voltage.

41
00:03:46,318 --> 00:03:51,428
As you can see, there is no current injection in this section.

42
00:03:56,550 --> 00:03:57,827
Creep Test

43
00:03:57,852 --> 00:04:07,543
Injecting 0.5% of the rated current with the rated voltage is performed in this section to check the performance or non-performance of the meter.

44
00:04:07,568 --> 00:04:15,141
In this section, you can also add points to perform the test based on the amount of watt-hour, pulse or duration.

45
00:04:20,310 --> 00:04:27,597
After each test, you can view the results in the Report window by selecting the Report View option.
