Directional Earth Fault

2
00:00:21,562 --> 00:00:31,796
Directional Earth Fault protection” with ANSI code (67N) is widely used for detecting phase-to-ground faults

3
00:00:32,109 --> 00:00:41,484
and serves as a backup protection in transmission lines, as well as in power plants and other facilities where

4
00:00:42,578 --> 00:00:46,796
directional earth fault detection is required

5
00:00:47,109 --> 00:00:53,125
Therefore, understanding the operation of this protection function is essential

6
00:00:53,281 --> 00:00:58,750
In this protection, the Self-Polarization method is used for fault detection

7
00:00:58,906 --> 00:01:05,156
meaning the fault voltage and current are utilized to determine the fault direction

8
00:01:05,859 --> 00:01:10,312
As shown in the figure, this voltage and current include VResidual = 3V0 and IResidual = 3I0

9
00:01:11,094 --> 00:01:18,281
The reason for using -3I0 relates to the relay's rear wiring configuration

10
00:01:18,906 --> 00:01:25,000
In Siemens relays, the wiring setup is recommended as shown in the figure

11
00:01:25,313 --> 00:01:34,453
As you can see from the wiring, the zero-sequence current enters the relay’s neutral CT in the reverse direction

12
00:01:35,000 --> 00:01:43,125
To determine the MTA (Maximum Torque Angle), the angle of 3V0 is rotated by φrotation in the clockwise direction

13
00:01:43,750 --> 00:01:52,578
After determining the MTA, a zone is considered forward (as shown in the figure) that spans 90 degrees on either side of the MTA

14
00:01:53,047 --> 00:01:57,968
As a result, the MTA angle is equal to: AngleMTA = (-180 - φrotation)

15
00:01:58,828 --> 00:02:05,656
Since the fault current Isc is injected from the tester during relay testing

16
00:02:06,047 --> 00:02:13,859
the MTA and the Sector Opening range must be defined in the tester software based on the injected current

17
00:02:14,484 --> 00:02:25,812
In this case, the calculations of 3V0 and -3I0 are implemented within the relay and according to its algorithm

18
00:02:26,672 --> 00:02:33,781
. Therefore, if the MTA angle in the tester software is increased by 180 degrees, the calculations in the tester (due to the injection of Isc current)

19
00:02:34,094 --> 00:02:39,015
will be as shown in the figure: **MTA = (-180 - φrotation) + 180 -----> MTA = - φrotation**
