﻿1
00:00:23,901 --> 00:00:23,956
“

2
00:00:23,957 --> 00:00:24,012
“C

3
00:00:24,013 --> 00:00:24,067
“Ca

4
00:00:24,068 --> 00:00:24,123
“Cal

5
00:00:24,124 --> 00:00:24,179
“Calc

6
00:00:24,180 --> 00:00:24,235
“Calcu

7
00:00:24,236 --> 00:00:24,290
“Calcul

8
00:00:24,291 --> 00:00:24,346
“Calcula

9
00:00:24,347 --> 00:00:24,402
“Calculat

10
00:00:24,403 --> 00:00:24,458
“Calculate

11
00:00:24,459 --> 00:00:24,513
“Calculated

12
00:00:24,514 --> 00:00:24,569
“Calculated

13
00:00:24,570 --> 00:00:24,625
“Calculated A

14
00:00:24,626 --> 00:00:24,681
“Calculated As

15
00:00:24,682 --> 00:00:24,736
“Calculated Ass

16
00:00:24,737 --> 00:00:24,792
“Calculated Asse

17
00:00:24,793 --> 00:00:24,848
“Calculated Asses

18
00:00:24,849 --> 00:00:24,904
“Calculated Assess

19
00:00:24,905 --> 00:00:24,959
“Calculated Assessm

20
00:00:24,960 --> 00:00:25,015
“Calculated Assessme

21
00:00:25,016 --> 00:00:25,071
“Calculated Assessmen

22
00:00:25,072 --> 00:00:25,127
“Calculated Assessment

23
00:00:25,128 --> 00:00:25,182
“Calculated Assessment”

24
00:00:25,183 --> 00:00:25,238
“Calculated Assessment”

25
00:00:25,239 --> 00:00:25,294
“Calculated Assessment” T

26
00:00:25,295 --> 00:00:25,350
“Calculated Assessment” Ta

27
00:00:25,351 --> 00:00:25,405
“Calculated Assessment” Tab

28
00:00:25,406 --> 00:00:25,461
“Calculated Assessment” Tab:

29
00:00:25,462 --> 00:00:25,862
“Calculated Assessment” Tab:

30
00:00:25,900 --> 00:00:28,928
In the “Calculated Assessment” tab of the “Measurement View” window,

31
00:00:28,953 --> 00:00:34,994
the mathematical operation can be performed between the assessments to create a new assessment and evaluate the test.

32
00:00:35,019 --> 00:00:43,643
It means that in this tab, a new parameter can be created in the specified mathematical operation that is performed for the “Actual” values of the assessments,

33
00:00:43,668 --> 00:00:49,901
and the parameter can be evaluated by the “Act” values that are selected from the “Ramp Assessment” and “Value Assessment” tabs.

34
00:00:49,926 --> 00:00:52,546
After specifying the name for the assessment,

35
00:00:52,571 --> 00:00:57,996
the intended mathematical operation in the “Calc” column will be selected. In the “X” and “Y” columns,

36
00:00:58,021 --> 00:01:03,185
one of the performed assessments will be selected in the “Ramp Assessment” and “Value Assessment”.

37
00:01:03,210 --> 00:01:11,250
Note that, the values that are positioned in the “X” and “Y” columns are in fact, the “Act” value of the performed assessments entered in these columns.

38
00:01:11,275 --> 00:01:20,212
For simpler separation of the evaluation names, the two letters of “V” and “R” that represent the “Value Assessment” and “Ramp assessment” are used.

39
00:01:20,244 --> 00:01:28,769
In the “Nom” column, the expected nominal value and in the “Dev+” and “Dev-” the positive and negative tolerances will be entered.

40
00:01:28,793 --> 00:01:40,464
The true result of the selected mathematical operation in the “Calc” column will be shown in the “Act” column and its deviation from the expected value will be shown in the “Dev” column and in percent.

41
00:01:40,488 --> 00:01:45,264
In the “Assessment” column, the result of the created assessment are specified.

42
00:01:45,288 --> 00:01:51,891
If the “Act” value is in the allowable range, the result of the assessment will be “Passed” with a green-colored sign.

43
00:01:51,915 --> 00:01:55,082
Otherwise, it will be “Failed” with a red-colored cross.

44
00:01:55,106 --> 00:01:59,397
In the “User Comment” column, you can enter your comment if you have any.

45
00:01:59,421 --> 00:02:09,291
In this test, in the “Ramp Assessment” tab, an assessment with the name of “Voltage” is performed for the “V L1-E” voltage that will be entered in the “X” column.

46
00:02:09,315 --> 00:02:17,267
In addition, in the “Value Assessment,” an evaluation with the name of “Current” is performed for the “IL1” that will be entered in the “Y” column.

47
00:02:17,291 --> 00:02:21,381
In the “Calc” column, the “X/Y” operation is selected.

48
00:02:21,405 --> 00:02:25,959
As you know, by dividing the voltage to current, resistance will be calculated.

49
00:02:26,015 --> 00:02:29,653
Therefore, the mane of this assessment is entered as “Resistance”.

50
00:02:29,677 --> 00:02:34,253
After specifying the “X” and “Y” columns values, the “Act” value is shown.

51
00:02:34,277 --> 00:02:42,824
In the “Nom” column, the nominal values are 15.7 and the “Dev+” and “Dev-” values are entered as 0.5.

52
00:02:42,848 --> 00:02:51,088
you can see that the “Act” is about 0.26 percent different from the nominal value specified by the user and the assessment is “Passed”.
